top of page
PRINCE OF PEACE PRESBYTERIAN CHURCH PROJECTS

​Prince of Peace since the replanting of the ministry in Corozal, had long term goals and short term goals in the area of infrastructure since 2013. Praise God we are in the last stages of one of our long term project which is the completion of the third floor of the Manse. The following remains of this project of which our church is progressively investing in it-

  • Plastering and Tiling the entire third floor

  • Toilet and PVC pipes for third floor

  • Ceiling and Painting of second room and living room

  • Electrification of the third floor.

  • Plastering outside of the third floor walls.

bottom of page